Dual Tape Head

Modifications to the Dual Taper Include:

  • New Gearing for Heads and Capstan
  • Tape Low Indicator Beacons
  • New Tape Holders
  • Laser Tape Low Indicator
  • Diameter Gauge Stands
  • Laser Tape Roll Tension
  • Threaded Tape Mounts
  • Contrex Lay Control
Dual Taper after renovations

Modifications to the Take-Up Include:

  • Change Orientation from Right to Left
  • New Fan Cooled Enclosure
  • 0-10vdc Air Clutch for Torque Tension
  • New Gearing for low speeds
Take-Up after Renovations

Modifications to the Payoff Include:

  • New Base and Uprights
  • 0-90vdc Tension Brake
  • New Dog Plate/Pin
Payoff after Renovations

Neutralizer

Modifications to the Neutralizer included:

  • Clean, replace bearings and paint
  • Build new control cabinet with operator controls
  • Update dancer arm prox sensors
  • New Bardac drives and PLC with “dancer controls”
  • Complete operator manual with pictures and parts list
Before renovations
Renovations completed
Before
After
Before
After